Techni-Gestion
  • Home
  • About us
  • Projects
  • The team
  • Career
  • Contact
  • Français

OTTAWA RIVER BRIDGE – 2013

Next in category
Prev in category
  • IMG_3834
  • IMG_3834
  • IMG_3822
  • IMG_3837
  • IMG_3847
  • IMG_3862
  • IMG_3863

OTTAWA RIVER BRIDGE – 2013

On bridge over Ottawa river, between L’ile Perrot and Sainte-Anne-de-Bellevue, three 32m TPG double track spans built in the beginning of the century needed to be replaced.

Techni-Gestion produced all the engineering drawings for the replacement of theses spans.  The types of spans chosen were two double track with direct fixation TPGs  and a twin open deck beam span.  Modification were also made ​​to two piers in order to suit the new spans geometry.

See also span replacement in 2000 at the same location.

About us

TECHNI-GESTION J.C. Inc. is a company that offers technical drafting services specialized in maintenance and rehabilitation of railroad track carrying structures as well as new railway bridges.

Contact

553, Grand Boulevard
Île Perrot (Québec) J7V 4X4
Canada

T. 514 425-2754
F. 514 425-5129
© 2017 | TECHNI-GESTION J.C. Inc.
Conception 3e joueur