Bridge over Highway 540, Ste-Foy
Replacement of an existing concrete rigid frame bridge with a two ballasted deck DPG span bridge on concrete pier...
Replacement of an existing concrete rigid frame bridge with a two ballasted deck DPG span bridge on concrete pier and abutments. A temporary bridge made of four steel TPG spans on steel bents was also required to support railway traffic during the reconstruction of the bridge. TECHNI-GESTION J.C. Inc. produced all engineering drawings for both […]
(GO TRANSIT) In 2010, TECHNI-GESTION J.C. INC. received the mandate to produce shop drawings for the fabrication of 8 steel TPG and beam spans supported on precast abutments and piers. Also on this contract, over 100 drawings were produced in order to show work procedures, field details for the installation of theses 8 spans, precast […]
Major maintenance repairs were performed in 1992 to this bridge over Fraser River in New Westminster, BC. The east approach over Front Street, CPR and BNR tracks was completely redesigned and all spans were replaced supported by new steel and concrete piers. Work involved the production of all the structural drawings for replacing two existing […]